User · Manager · Administrator
Manual and frequently asked questions
Look up calculation rules, worklog destinations and answers to common questions.
Before you start
Open the topic that matches your question or download a Portuguese PDF guide.
Frequently asked questions
Which issue receives my time?
An entry made in a Jira issue or subtask stays on the item you opened. In the main timer or form, a Project ID uses the configured general-time issue. Miscellaneous uses its internal-work destination. The report groups all worklogs classified under the same Project ID.
Do I choose an activity for project work?
For a project, confirm the Project ID and issue. For Miscellaneous, choose an activity such as an internal meeting or training. Existing project activities remain available in historical reports.
How do I log work on a project without its own space?
In Organization → Project IDs, a manager creates or opens the code and chooses a destination issue without linking a space. Once the destination has been applied and saved, select the project code in the timer or form.
Which classification takes precedence?
A manual classification saved on the worklog takes precedence for that entry. Automatic selection can use a Jira project field or a linked space. If sources disagree, check the issue code and select the correct project. For Miscellaneous, check the internal activity.
What does Stop do in the timer?
Start begins timing. Stop saves to Jira in whole minutes, with a one-minute minimum. Delete discards the timer. Selecting a favourite prepares the destination. For time already worked, open the manual form and enter the start and duration.
How do I edit or delete a worklog?
In My Timesheet → Worklogs or Week, open the entry and choose an available action. Edit lets you correct its details. Delete asks for confirmation and removes the Jira worklog. Check the issue and duration first. Available actions depend on authorship and Jira permissions.
How do I duplicate an entry?
From Worklogs or the week detail, choose Duplicate entry. Check the new date, start time, duration and description before saving. The copy creates another worklog on the source issue and retains the original visibility restrictions.
Can I log future work?
The form accepts entries up to seven calendar days after today in the organisation’s time zone. The entry must end by midnight after the last allowed day. Reports identify future entries. The timer starts when you select Start.
Why does today’s total show a partial query?
Today’s entries displays your visible worklogs using their start time in the configured zone. If access or authorship leaves gaps, the total sums only identified entries. Refresh and check the worklog on the Jira issue if you expected a different result.
How do I read weekly progress?
On Week, use the arrows and week number to confirm the dates. Progress follows the displayed week. Work and credited leave can cover the schedule. On a 40-hour schedule, 32 hours worked plus eight hours of vacation account for 40 hours.
Why do some weekends appear in the chart?
The daily chart hides confirmed rest days without work. It keeps scheduled shifts, recorded work and days with an unconfirmed schedule. In Team timesheet, Show weekends displays the individual Saturday and Sunday columns.
How are overlaps calculated?
ScopeTime compares each loaded personal worklog’s start and duration. Review overlaps shows the affected pairs and includes projects outside the distribution filters. If three entries overlap from 10:00 to 10:15, that interval adds 15 minutes to the simultaneous-time total.
Why can I see expected hours while missing hours are unconfirmed?
Expected hours come from the profile, holidays and absences. A shortfall requires a completed day, a known schedule and sufficient personal worklog coverage. Today is still in progress. A period with unconfirmed relevant data can keep its balance open.
Why is a project shown when all entries are classified?
The unclassified count covers selected entries that still need a Project ID or a Miscellaneous activity. The project with the most hours comes from the distribution of all selected work. You can have zero outstanding entries and still have a highest-hours project.
Why can I see a person who has never logged time?
Analysis → People and Organization → People and schedules include the active personal accounts visible to your Jira account. Profile pending indicates an account without a profile. Use Set up profile and Save configuration to configure the person before any worklogs exist. Refresh Jira directory repeats the directory lookup.
Where does the employee number appear?
Enter the optional number on the profile or when confirming a person’s match during an annual import. Leading zeros are preserved. Operational lists show names. In report results and exports, a populated number appears beside the name.
How do I record vacation, sick leave or another absence?
With an active profile, open My Timesheet → Holidays and absences → Add period. Choose the category, dates and either full day or hours per day. You can change your own periods. Authorised managers can adjust them in Organization → Calendar and absences.
How are vacation and holidays credited on an eight-hour day?
On a scheduled eight-hour weekday, full-day vacation credits eight hours under Vacation and leaves zero expected work. Two hours of absence leave six expected working hours. A coincident public holiday is counted once. Saturdays and Sundays get zero calendar credit. Actual work on those days contributes to working hours.
How do I match people from the annual spreadsheet?
Import the file containing the PlanoFerias sheet, then review year, establishment and matches. A previously linked employee number identifies the profile. Confirm name suggestions and leave out people without a matching Jira account. Review conflicts and categories, apply to the draft and save.
How do I import national public holidays?
In Organization → Calendar and absences, open the national holiday import and select a country and year. Check dates and affected people, apply to the draft and save the configuration. You can also add local holidays and exceptions in the calendar.
What do the colours mean on the Team timesheet?
For completed days, green with a check means work and calendar credits cover the schedule. An exclamation mark flags a shortfall. A question mark shows a value awaiting confirmation. Open the cell to compare schedule, categories and visible worklogs.
Which report shows who worked on a project?
In Reports, choose a period and Hours by project. The file lists each project total and the people who contributed. Hours by person starts from the individual and breaks their hours down by project. Hours by project and activity details Miscellaneous and historical activities.
How do I export someone else’s person analysis?
On the Person analysis card, the direct PDF and Excel shortcuts use your account. Choose View, select an authorised person and apply the date range. Export PDF or Excel inside the open analysis. A team lead can also start from a name on the Team timesheet.
How do Team timesheet, Capacity and Planning differ?
Team timesheet shows daily work and calendar categories for current members. Capacity compares logged hours with the available schedule in a period. Planning allocates future estimates by person, month and project and compares them with actual work.
How do I export the current view?
Use Report for this view to export the current period, filters and grouping. Include individual worklogs when the option is available. PDF and Excel are available for sharing. Advanced options can include CSV and HTML. The standard reports in the Reports menu use the selected period.
How do I compare a project’s estimated hours?
In Organization → Project IDs, open the project hours plan, set its hours and dates, then save. In Projects, choose the full plan period to compare the estimate with accessible logged work. The view identifies future entries and unconfirmed data.
Who can change the capacity plan?
Organisation managers and Jira administrators can view Planning. A Jira administrator can set global efficiency and create, copy or move allocations. At 80% efficiency, a 40-hour estimate reserves 50 hours of capacity. Compare estimates with worklogs under Planned vs. actual.
Why does a reminder ask me to review a fully covered day?
A daily reminder can find overlaps or missing classification on a day already covered. Review my entries opens that day’s worklogs. A shortfall is reported when the schedule and worklog coverage support it.
Why does an issue appear in the email and how do I send without it?
Jira’s notification channel uses a context issue and can show its space, key and title. To send an individual message without that context, configure Jira Automation in Organization → Emails and create a rule with the recipient’s personal connection. Check the mailbox to confirm delivery.
Who can see another person’s data?
My Timesheet shows your own entries. A team lead can open the timesheet and person analysis for the teams they lead. Collective analysis and general configuration require organisation-manager or Jira-administrator access. Jira permissions continue to determine which data the account can see.
What is saved when I apply a draft?
Apply updates the Organization draft. Save configuration commits it. If another person has changed the configuration, review the conflict. History shows the revision, author, date and changed fields to help diagnose differences.
How do I archive or restore a catalogue item?
Use the separate Show archived and Show deleted filters to locate catalogue entries. The app checks existing references before a delete or restore. Removing a person from the active population preserves the Jira account and worklog authorship. Worklogs have their own deletion action in Worklogs.
How do I refresh data or check diagnostics?
Refresh reads the worklogs for the period again. After a Jira change, check the start date and filters. To investigate an issue, open Help → Diagnostics and performance, prepare the file and review it before sharing it with support.
Where do I change theme and language?
Open Preferences at the foot of the ScopeTime sidebar and choose Light or Dark and Portuguese or English. The preferences belong to your account. The panel embedded on a work item follows the Jira theme.
How does ScopeTime work alongside Tempo or other apps?
ScopeTime uses native Jira worklogs. Visibility and attribution can vary when another app records work under a technical account. Check the origin before assigning hours to a person or interpreting a partial personal total.